My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00527
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00527
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:27 AM
Creation date
10/5/2006 11:59:31 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0024X
Contractor Name
Florida Water Conservancy District
Contract Type
Loan
Water District
0
County
La Plata
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />7.0 HYDROELECTRIC FACILITIES <br /> <br />The hydroelectric facility design is described in this <br />chapter, and includes the equipment selected for inclusion in the <br />feasibili ty study. The equipment was selected to allow for cost <br />estimate to be made and to assure that it is available. However, <br />the actual equipment installed may be different. The design <br />calculations are summarized in this chapter and the backup data is <br />described in the appropriate appendix. <br /> <br />The hydroelectric power plant would be installed in the gate <br />chamber of Lemon Dam and would utilize the existing bypass pipe <br />through the chamber as a penstock. This chapter describes the <br />existing facilities, installation and selection of the turbine, <br />head and flow, electrical equipment, and cost estimates. <br /> <br />7.1 EXISTING FACILITIES <br />The Lemon Dam spillway and outlet works are located on the <br />right hand side (looking downstream) of the embankment. The <br />spillway is un gated with the outlet at elevation 8148 feet. The <br />intake structure for the outlet works is also located on the right <br />hand side of the dam and has an inlet elevation of 8005 feet. The <br />top of the structure is at elevation 8018 ft. Water enters a <br />five-foot diameter vertical pipe through the intake structure; the <br />5-ft pipe makes a 90 degree vertical to horizontal bend then <br />expands to a 8. 5-ft diameter pipe which conveys water 900 ft to <br />the gate chamber/outlet control gates. <br /> <br />Releases through the outlet works are controlled by two pairs <br />of outlet gates, each capable of releasing 455 cfs at maximum <br />water surface. Below the gates is a nine-foot high horseshoe <br />shaped, unpressurized tunnel which daylights to the river channel <br />below the dam. The outlet gates are operated in the gate chamber <br />which is on the center line of the dam. <br /> <br />7.0-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.