My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00519
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00519
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:46 AM
Creation date
10/5/2006 11:59:20 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153597
Contractor Name
Windsor Reservoir and Canal Company
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
HB 91-1006
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Woodward.CIyde Consultants <br /> <br />Mr. Keith Eberhardt <br />Colorado Water Conservation Board <br />January 8, 1991 <br />Page 3 <br /> <br />Reservoir and Canal Company will take out a 20 year, 12% loan from a <br />financial institution to cover the balance of the project costs and both the <br />CWCB and other loan payments wilJ be made by assessments to the <br />shareholders. <br /> <br />If you have any further questions or issues that require clarification, please call. Thank <br />you again for timely consideration of this report and the request for funding. <br /> <br />Sincerely, <br /> <br /> <br />John W. Andrew <br />Project Manager <br /> <br />PYO:kaj <br /> <br />Enclosures (7) <br /> <br />lc w / encl: Windsor Reservoir and Canal Company, Eaton, CO <br />Binder 22539 <br /> <br />22539(22539.LEl OI.08-91(REPORTS3(kaj) <br />
The URL can be used to link to this page
Your browser does not support the video tag.