My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00519
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00519
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:46 AM
Creation date
10/5/2006 11:59:20 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153597
Contractor Name
Windsor Reservoir and Canal Company
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
HB 91-1006
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Woodward.Clyde Consultants <br /> <br />Table 6-1 <br />Construction Cost Estimate <br />Alternative 1 <br /> <br />Item Quantity Units Unit Cost Cost <br />CIBWoll 14000 sf $15.00 $210,000 <br />Spillway Construction 1 Is $205.100 $205.100 <br />Toe Drain 600 II $10 $6,000 <br />Piezometers 1 LS $6.000 $6.000 <br />Monuments 1 LS $7,000 $7.000 <br />Surveys I LS $5.000 $5.000 <br />As-Built Drawings I LS $7.000 $7.000 <br /> Item Total $44!ii1(j()... <br />Mob/Oemob (8 %) $35.700 <br />Construction Observation (12 %) $53,500 <br /> I Sub Total ..ii.$535,300 <br />Contingency J 5 % $80.300 <br /> Grand Total $615.600 <br /> <br />Table 6-2 <br /> <br />Construction Cost Estimate <br />Alternative 2 <br /> <br />Item Quantity Units Unit Cost Cost <br />Excavation 4800 cy $1.50 $7.200 <br />Fill 8500 cy $5.00 $42,500 <br />Riprap 3200 cy $10.00 $32,000 <br />Bedding Material 1300 cy $12.00 $15.600 <br />SIB Wall 9000 sf $10.00 $90.000 <br />Filter Material 720 cy $12.00 $8.600 <br />Spillway Construction 1 Is $205.100 $205,100 <br />Toe Drain 550 II $10 $5.500 <br />Piezometers 1 LS $6,000 $6,000 <br />Monuments 1 LS $7.000 $7.000 <br />Surveys 1 LS $5,000 $5,000 <br />As-Built Drawings 1 LS $7.000 $7.000 <br /> Item Total .i..$431;5(j() <br />Mob/Oemob (8 %) $34 .500 <br />Construction Observation (12 %) $51,800 <br /> I Sub Total i$517;~00. <br />Contingency 15 % $77.700 <br /> Grand Total $595,500 <br /> <br />1o'CCNo_ 2B3g <br />
The URL can be used to link to this page
Your browser does not support the video tag.