My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00514
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00514
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:27 AM
Creation date
10/5/2006 11:59:02 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153160
Contractor Name
Ridgeway, Town of
Contract Type
Grant
Water District
0
County
Ouray
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Mr. Nick Ioannide;~ <br />May 5, 1977 <br />Page 4 <br /> <br />Estimated Cost for Chapter V: <br /> <br />Principal Engineer: 27 hours @ $28 <br />Technician: 10 hours @ $20 <br />Draftsman: 25 hours @ $15 <br />Secretary: 10 hours @ $6 <br />Mileage: 312 miles @ $0.20 <br /> <br />Total <br /> <br />,. <br />I <br /> <br />= $ 756.00 <br />= 200.00 <br />= 375.00 <br />= 60.00 <br />= 62.40 <br /> <br />$1,453.40 <br /> <br />Chapter VI: In Chapter VI we will present project estimates with a <br />detailed breakdown of permanent materials, labor, equipment, con- <br />struction contingency fund, legal and administration costs, engineer- <br />ing and inspection fees, land and right-of-way purchases, operation <br />and maintenance costs, reserve fund (if needed), and an emergency <br />operating fund. Future cost escalations will be provided under a <br />separate article. <br /> <br />Estimated Cost for Chapter VI: <br /> <br />Principal Engineer: 10 hours @ $28 <br />Secretary: 6 hours @ $15 <br /> <br />Total <br /> <br />= $280.00 <br />= 36.00 <br /> <br />$316.00 <br /> <br />(Note: Some of the cost of Chapter VI is incorporated in <br />Chapter V) <br /> <br />Chapter VII: In Chapter VII a project evaluation will be presented. <br />As the majority of the water will be used for M & I purposes, the <br />chapter will be reflective of this. The payment capacity of the <br />applicant will be analyzed thoroughly. <br /> <br />Estimated Cost of Chapter VII: <br /> <br />Principal Engineer: 8 hours @ $28 <br />Secretary: 4 hours @ $6 <br /> <br />Total;' <br /> <br />.,;':~. <br />, , <br /> <br />= $224.00 <br />= 24.00 <br /> <br />$248.00 <br /> <br />Chapter VIII: In Chapter VIII we will present an overall detailed <br />financial program which will include, but .not be limited to, water <br />rates, debt repayment, reserve fund, operation and maintenance, <br />emergency operating reserve, amortization and depreciation schedule <br />and estimated annual growth with noted expenditures and revenues <br />anticipated. <br /> <br />Correspondingly, a complete method for project financing will be out- <br />lined. This will include required financing from the Colorado Water <br />
The URL can be used to link to this page
Your browser does not support the video tag.