Laserfiche WebLink
<br />Mr. Nick Ioannide ..~ <br />May 5, 1977 <br />Page 5 <br /> <br />.-. <br />(~ . <br /> <br />Conservation Construction Fund together with loans and/or grants <br />from federal agencies such as FHA, EDA, Four Corners Regional <br />Commission, etc. Such applications as needed will be submitted <br />along with personal meetings with representatives of these different <br />agencies to determine the eligibility and extent to which the Town <br />of Ridgway is eligible for lOans and/or grants will be conducted. <br /> <br />Estimated Cost for Chapter VIII: <br /> <br />Principal Engineer: 30 hours @ $28 <br />Secretary: 16 hours @ $6 <br />Professional Consultants: <br />6 hours @ $25 <br />Mileage & Expenses: lUrrp sum <br /> <br />= $ 840.00 <br />= 96 . 00 <br /> <br />= 150.00 <br />= 308.80 <br /> <br />Total <br /> <br />$1,394.80 <br /> <br />The total overall estimated Cost of the proposed Feasibility Study <br />is $7,600. The conditions as set forth in the letter of April 29, 1977, <br />from the Colorado Water Conservation Board are wholly acceptable to our <br />firm. <br /> <br />We are looking forward to th~ opportunity of working with both the <br />Water Conservation Board and the Tow~ of Ridgway on this project. <br /> <br />Very truly yours, <br /> <br />MESA ENGINEERING & SURVEYING CO., INC. <br /> <br />,,~Sl8Jd~a~ <br /> <br />David P. Duncan <br /> <br />xc: George C. Hicks, Mayor <br />Town of Ridgway, Colorado <br /> <br />'f? <br />~ <br /> <br />.t~ <br /> <br />DPD/llj <br /> <br />/ <br />