My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00514
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00514
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:27 AM
Creation date
10/5/2006 11:59:02 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153160
Contractor Name
Ridgeway, Town of
Contract Type
Grant
Water District
0
County
Ouray
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Mr. Nick Ioannides- <br />May 5, 1977 <br />Page 3 <br /> <br />. <br /> <br />Estimated Cost for Chapter III: <br /> <br />Principal Engineer: 10 hours @ $28 <br />Technician: 18 hours @ $20 <br />Draftsman: 8 hours @ $15 <br />Secretary: 5 hours @ $6 <br />Documents: lump sum @ $15 <br />Mileage: 100 miles @ $0.20 <br /> <br />Total <br /> <br />'). ." '.>, - <br /> <br />re <br /> <br />, <br /> <br />= $280.00 <br />= 360.00 <br />= 120.00 <br />= 30.00 <br />= 15.00 <br />= 20.00 <br /> $825.00 <br /> <br />Chapter IV: In Chapter IV we will present as accurately as possible, <br />the present water usage for the Town of Ridgway for M & I. Parshall <br />flumes will be used at the point of diversion and point of delivery <br />to determine water losses. Records obtained from Federal agencies <br />will be used to determine stream flows. An index of water rights <br />listing amounts and priorities will be listed as well as calculations <br />as to the most probable yield. In each of the alternates a complete <br />analysis will be presented regarding availability of water, both <br />theoretical and existing, chemical and physical character of the <br />water including color, odor, biocides, etc., as well as physical <br />objects such as diversion structures and transport system. <br /> <br />Estimated Cost for Chapter IV: <br /> <br />Principal Engineer: 5 hours @ $28 <br />Technician: 35 hours @ $20 <br />Draftsman: 4 hours @ $15 <br />Secretary: 10 hours @ $6 <br />Mileage: 286 miles @ $0.20 <br />Consultants & Laboratory: <br />lump sum @ $200 <br /> <br />Total <br /> <br />= $ 140.00 <br />= 700.00 <br />= 60.00 <br />= 60.00 <br />= 57.20 <br />= 200.00 <br /> $1,217.20 <br /> <br />Chapter V: In Chapter V we will present the physical aspects of the <br />project showing existing and proposed facilities. As the old system <br />is unusable in its entirety, the new sys~em will be outlined as to <br />M & I water supply, design criteria for structural plans, treatment <br />facilities and storage tanks together with all hydraulic calculations. <br />Geological maps and subsurface information will be provided to the <br />extent of all avialable maps, logs and personal knowledge. As no <br />major drainage is anticipated and reservoirs withholding, no major <br />emphasis will be placed on this. All necessary rights of way, ease- <br />ments and land pruchase will be described fully. <br />
The URL can be used to link to this page
Your browser does not support the video tag.