My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00514
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00514
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:27 AM
Creation date
10/5/2006 11:59:02 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153160
Contractor Name
Ridgeway, Town of
Contract Type
Grant
Water District
0
County
Ouray
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />(. <br />Mr. Nick Ioannides <br />May 5, 1977 <br />Page 2 <br /> <br />,'. <br /> <br />Estimated Cost for Chapter I: <br /> <br />Principal Engineer: 10 hours @ $28 <br />Technician: 32 hours @ $20 <br />Draftsman: 6 hours @ $15 <br />Secretary: 5 hours @ $6 <br />Mileage: 260 miles @ $0.20 <br /> <br />= $ 280.00 <br />= 640.00 <br />= 90.00 <br />= 30.00 <br />= 52.00 <br /> <br />Total <br /> <br />$1,092.00 <br /> <br />Chapter II: In Chapter II we will provide the Board with informa- <br />tion on all Articles of Incorporation together with By-laws. Simi- <br />larly, all powers and authorities of this entity with regard to <br />right to eminent domain, taxing authority, contractual authority, <br />vesting authority, etc., will be included. <br /> <br />The overall financial status and audits of the Town for the last <br />two years will be featured with paz,ticular emphasis on the income <br />and expenditures as related to the existing water system. <br /> <br />A full inventory of the existing system and treatment facilities <br />will be included. This will contain information regarding the <br />physical condition, age and alignme~t of water mains, service <br />lines, fire hydrants, storage reservoirs and treatment facilities. <br />This inventory will further include, present maintenance equipment <br />with suggestions and information regarding places where additional <br />equipment may be obtained. <br /> <br />Estimated Cost for Chapter II: <br /> <br />Principal Engineer: 7.5 hours @ $28 = <br />Technician: 22 hours @ $20 = <br />Draftsman: 10 hours @ $15 = <br />Secretary: 5 hours @ $6 = <br />Mileage: 288 miles @ $0.20 = <br /> <br />$210.00 <br />440.00 <br />150.00 <br />30.00 <br />57.60 <br /> <br />,';+..f~,; <br /> <br />Total <br /> <br />$887.60 <br /> <br />Chapter III: In Chapter III we will pre~ent a Service Area map <br />showing agricultural, residential a.nd industrial areas. As this <br />proposed project is primarily a domestic potable system with irri- <br />gation limited to small gardens and lawns, no particular emphasis <br />will be given to mass agricultural use. with limited industrial <br />use at present, and future use "guess work", an analysis will be <br />presented as to anticipated use. hn index map and tabulation <br />sheet showing ownership of public cmd private land will be included. <br />
The URL can be used to link to this page
Your browser does not support the video tag.