My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00514
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00514
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:27 AM
Creation date
10/5/2006 11:59:02 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153160
Contractor Name
Ridgeway, Town of
Contract Type
Grant
Water District
0
County
Ouray
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />HIGHWAY E.NGINE.ERING <br />WATER AND SEWER SYSTEMS <br />IRRIGATION SYSTEMS <br />DRAFTING SERVICE <br /> <br />,. <br /> <br />ML <br /> <br />. <br />ENGINEERING & SUR VEYIN( J. <br /> <br />APPENDIX A <br /> <br />General Civil Engineering <br />P. O. Box 12~7 <br />MONTROSE. COLORADO 81401 <br />249.7771 <br /> <br />PROPERTY SURVEYS <br />SUBDIVISIONS <br />CONSTRUCTION SURVEYS <br />MATERIAL.S TESTING <br /> <br />May 5, 1977 <br /> <br />ED ~l~~ffiWImm <br />i.\,. MAY 1119n~111Jf <br />, ~.!Ji <br />~_._. . <br />______.J __ <br />COLO. V'i,~ En <br />CONSERVATlC:'~ BOARD <br /> <br />Mr. Nick Ioannides <br />Supervisor Water Resource <br />823 State Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br /> <br />Dear Nick: <br /> <br />Pursuant to our telephone conversation of this date, we are <br />modifying our proposal for a Water Feasibility Study for the Town of <br />Ridgway, Colorado, as follows: <br /> <br />Preface: Prior to Chapter I of the Study we will provide the <br />following prefacing material: <br /> <br />a) Ti tle Page <br />b) Letter of Transmittal <br />c) Resolution of applying organization <br />d) Table of Contents <br />e) List of maps and exhibits <br />f) Project Summary (brief resume of the contents of the <br />Feasibility Study) <br /> <br />Estimated Cost for Preface: <br /> <br />Principal Engineer: 2 hours <br />Technician: 4 hours @ $20 <br />Secretary: 5 hours @ $6 <br /> <br />@ $28 <br /> <br />= <br /> <br />$ 56.00 <br />80.00 <br />30.00 <br /> <br />= <br /> <br />.1 <br /> <br />= <br /> <br />Total <br /> <br />$166.00 <br /> <br />Chapter I: In Chapter I we will provide a detailed Project Map <br />showing the existing system, and on separate maps the proposed <br />alternatives. Similarly, we will include a Vicinity Map showing <br />the Project and Town's location with respect to the nearest larger <br />communities. As this will be transposed to a quadrangle map, rela- <br />tive elevations of the project will be included. Detailed informa- <br />tion with respect to climate will be included to the extent of <br />available Weather Bureau records and local data. <br /> <br />APPENDIX A <br />
The URL can be used to link to this page
Your browser does not support the video tag.