My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00505
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00505
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:27 AM
Creation date
10/5/2006 11:58:34 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153419
Contractor Name
San Miguel Water Conservancy District
Water District
0
County
San Miguel
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br /> <br />. <br />I <br /> <br />I <br />. <br /> <br />. <br /> <br />I <br />I <br /> <br />I <br />I <br />II <br /> <br />I <br /> <br />. <br />I <br />I <br /> <br />. <br />. <br />I <br />'. <br /> <br /> <br />TASK DESCRIPTION - Continued <br /> <br />11. Prepare Feasibility Level Designs and Drawings - Design will <br /> <br /> <br />essentially be limited to dam cross-section and stability <br /> <br /> <br />analysis, outlet works and spillway. Some minimal improvement <br /> <br /> <br />work may be included on conveyance facilities. Since this is an <br /> <br /> <br />off-channel reservoir, spillway design flood analysis will be <br /> <br /> <br />minor. Two 24 x 36 drawings will be prepared. <br /> <br />Chapter VI - Estimated Costs <br /> <br />12. Determine Quantities of Construction Items - A list of items <br /> <br /> <br />similar to a bidding schedule will be prepared. Quantities will <br /> <br /> <br />be estimated by accepted methods. <br /> <br />13. Determine Unit Price - Unit prices will be ~t the 1984 level and <br />will be determined from abstracts of recent bids on similar <br />types of work in the Western Colorado area. <br /> <br />14. Prepare Summary of Estimated Costs - Format will follow that <br />recommended by CWCB. <br /> <br />15. Determine Operation. Maintenance and Replacement Costs - These <br /> <br /> <br />costs will be based on historic operating costs for the existing <br /> <br /> <br />reservoir. <br /> <br />16. <br /> <br />, ,,\ " <br />, tr;t <br />D' $', -" <br />, , ~' <br />I J'" <br />',.' I'" <br />vV' ;J'r <br />/ \ <br />Determine Repayment Ability - Since the water developed by this <br />project will be supplemental. the repayment ability will be <br />primarily based on an expressed "willingness to pay" by the <br /> <br />Chapter VII - Project Evaluation <br /> <br />water users. <br /> <br />Chapter VIII - Financial Program <br /> <br />17. Prepare Repayment Schedule - Project will be essentially for <br /> <br />irrigation purposes and will be repaid from water sales. <br /> <br />-5- <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.