My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00505
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00505
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:27 AM
Creation date
10/5/2006 11:58:34 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153419
Contractor Name
San Miguel Water Conservancy District
Water District
0
County
San Miguel
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />TASK DESCRIPTION - Continued <br /> <br />7. <br /> <br />Determine Water Availability - Water to fill enlarged reservoir <br /> <br /> <br />will come through existing ditches. Water supply study must <br /> <br /> <br />analyze existing water rights, ditch capacities, and average <br /> <br /> <br />runoff from presently ungaged streams. Statistical correlations <br /> <br /> <br />will be required. A map of watershed areas and a line diagram of <br /> <br /> <br />stream and ditch systems will be included. This task will be <br /> <br /> <br />coordinated with similar task in the San Miguel Project Study. <br /> <br />8. <br /> <br />Develop Plan of Operations for Enlarged Reservoir - Planned <br /> <br /> <br />delivery schedules will be dependent on working agreements <br /> <br /> <br />developed by ditch companies. Report will show monthly <br /> <br /> <br />reservoir operation for a series of years in conjunction with <br /> <br /> <br />other existing facilities. <br /> <br />9. <br /> <br />Provide Data Regarding <br />watersheds is known to be <br />analysis. <br /> <br />Water Quality <br />of high quality <br /> <br />Water from high <br />- USBR has reports of <br /> <br />Chapter V - Plan of Development <br /> <br />10. Perform Geologic Investigations - Since the project involves <br /> <br /> <br />raising an existing dam, it is imperative that sufficient <br /> <br /> <br />information be obtained to provide tentative approval of <br /> <br /> <br />proposed construction methods from State Engineer's office. <br /> <br /> <br />Proposed field work will include drilling three core holes into <br /> <br /> <br />bedrock, three auger holes, and six test pits and a geologic map <br /> <br /> <br />and report relating to the suitability of the existing dam as a <br /> <br /> <br />foundation for the enlargement will be included in this task. <br /> <br /> <br />Refer to Appendix 1 for details of proposed exploration. <br /> <br />-4- <br /> <br /> <br />'ESTERN <br />ENGINEERS.INC, <br />
The URL can be used to link to this page
Your browser does not support the video tag.