My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00505
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00505
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:27 AM
Creation date
10/5/2006 11:58:34 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153419
Contractor Name
San Miguel Water Conservancy District
Water District
0
County
San Miguel
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />TASK DESCiIPTION - Continued <br /> <br />I <br /> <br />General <br /> <br />I <br /> <br />18. Draft and Edit Report - Writing will proceed intermi'.:tently <br />throughout study period. Preliminary drafts will be available at <br />review meetings. <br /> <br />I <br /> <br />I <br /> <br />F. Manpower Schedule <br /> <br />I <br /> <br />It is proposed that some aspects of this study will proceed <br />concurrently with the area-wide appraisal study to be carried out <br />during approximately the same period. By utilizing some of the same <br />personnel. some of the study costs (particularly transportation) can <br />be reduced. The table on the following page provides a monthly <br />schedule of manpower cOllllllitments by task number as described in <br />paragraph D. <br /> <br />I <br /> <br />I <br /> <br />'I <br /> <br />G. <br /> <br />Milestones <br /> <br />I <br /> <br />Proposed milestones during the preparation of the feasibility <br />study are as follows: <br /> <br />I <br /> <br />I <br /> <br />June 1 - Notice to proceed <br /> <br /> <br />~,Ji"June 10- COllllllence drilling and geologic investigation <br /> <br /> <br />June 15- Field inspection with owners <br /> <br /> <br />June 30- Submit conceptual plan of operation to owners <br /> <br /> <br />July 30 - Submit draft water supply study to owners <br /> <br /> <br />August 30 - Meet with CWCB and State Engineer personnel to discuss <br /> <br /> <br />proposed designs <br /> <br /> <br />September 15 - Submit draft report <br /> <br /> <br />October - Submit final report <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />-6- <br /> <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.