Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />80uJderand left Hand Repair of Oullel Works <br />CWCBFeasibilityStudy <br />November 5, 1999 <br /> <br /> Table 4 <br /> Summary of Estimated Costs for Pipe Installation <br /> Twin lakes (a.k.a. Davis No.1 Dam) <br /> Unit Costs Item Costs <br />Description Quantity Unit Low High Low High <br /> Estimate Estimate Estimate Estimate <br />Steel, 'Is" wall 62 LF $275 $325 $17,050 $20,150 <br />RCP, Class 3 62 LF $225 $250 $13,950 $15,500 <br />HDPE, SDR 32,5 (50 psi) 62 LF $250 $300 $15,550 $18,600 <br /> <br /> Table 5 <br />Drop-Inlet Spillway and Outlet Construction Cost Estimate <br /> Twin lakes (a,k,a. Davis No.1 Dam) <br /> Unit Costs Item Costs <br />Description Quantity Unit Low High Low High <br /> Estimate Estimate Estimate Estimate <br />Mobilization 1 LS $4,000 $6,000 $4,000 $6,000 <br />Excavation 1,265 CY $4 $7 $5,060 $8,855 <br />Dam Foundation Preparation 1 LS $4,000 $6,000 $4,000 $6,000 <br />and Dewatering <br />Hauling, Placement and 1,265 CY $7 $9 $8,855 $11,385 <br />Compaction of Embankment <br />Hauling, Placement and 20 CY $18 $22 $360 $440 <br />Compaction of Pipe Bedding <br />Precast, Concrete Manhole: 1 LS $1,200 $1,600 $1,200 $1,600 <br />60-inch diameter, 9.7-foot <br />height, 96-inch base, rubber <br />o-ring seals <br />Dam Crest Cut and Fill 330 CY $4 $7 $1,320 $2,310 <br />Steel Pipe, 'Is-inch wall, 30- 62 LF $275 $325 $17,050 $20,150 <br />inch diameter <br />30,inch Headgate with 10 1 LS $4,000 $5,000 $4,000 $5,000 <br />feet of Galvanized Frame <br />Class 6 Road Base 370 CY $18 $22 $6,660 $8,140 <br />Riprap and Bedding 80 Ton $14 $18 $1,120 $1 ,440 <br />Walkway, Trash Racks, and 1 LS $6,000 $8,000 $6,000 $8,000 <br />Miscellaneous Supports <br />Total Budget Estimate $59,625 $79,320 <br /> <br />-7- <br />