My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00470
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00470
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:26 AM
Creation date
10/5/2006 11:56:42 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153477
Contractor Name
Victor, City of
Water District
0
County
Teller
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />." <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />22 <br /> <br />Nr. Hilliams also completed hydraulic design of the spillway and outlet works for <br />the Big Sandy Dam and Reservoir, and the engineering analysis for consideration <br />of lesser spillway design on Van Bibber dam in Arvada. This latter study was <br />submitted to the Colorado State Engineer and included an evaluation of dam <br />failure using the "DAI1BRK MODEL" of the National Heather Service. <br /> <br />11r. Hilliams has worked with many hydrologic models, including the Unitgraph <br />Method of the USBR, the Flood Flow Frequency Ana 1ysi s of the ,later Resources <br />Council, the HEC series of the Army Corps of Engineers, the Colorado Urban <br />Hydrograph Procedure-S, the Soil Conservation Service's TR series, the EPA's <br />Storm l;ater f1anagement Model (SHMM), the DAMBRK Model of the National ;Ieather <br />Service. He has used the models frequently and has established contacts in each <br />of the agencies for assistance when models must be manipulated to accurately <br />reflect actual conditions. <br /> <br />Responsibilities for coordination of all surveying services on the project will <br />fall to Bryan Clark. Mr. Clark has 11 years of surveying experience in the Rocky <br />~lountain region. For the last 8 years, he has been in responsible charge of a <br />surveying business or department with responsibility for manY~"different project <br />types. He has managed and served as party chief on all types of land surveying <br />projects, including boundary surveys, right-of-way surveys, photo control work <br />for aerial topographic mapping, and mapping by field methods. In addition, he <br />has extensive experience in design and construction surveying for roads, bridges, <br />water lines, storm and sanitary sewers, gas and electric utilities, drainage and <br />flood control facilities, and site development projects involving grading, curb <br />and gutter, streets, utilities, building layout, and drainage. <br /> <br />Recent projects managed by Mr. Clark include a right-of-way survey along 4.5 <br />miles of the South Platte River in connection with a rechannelization project and <br />design and construction surveying for a $2 million drainage and park facility in <br />the Denver Tech Center. <br />
The URL can be used to link to this page
Your browser does not support the video tag.