My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00456
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00456
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:26 AM
Creation date
10/5/2006 11:56:10 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0003X
Contractor Name
Clear Creek Project CWRPDA
Contract Type
Loan
Water District
0
County
Clear Creek
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />--' <br /> <br />TABLE 3.1 <br />Highway Relocation Alternatives <br /> <br />Alternative <br />No. DescriDtion <br /> <br />1 Relocate 13 miles of U.S. Highway 6 within Clear Creek Canyon, <br />including two bridges over the reservoir near the U.S. <br />Highway 6/S.H. 119 intersection. Relocate S.H. 119 within North <br />Clear Creek Canyon, connecting to 1-70 at the top of Floyd Hill <br />(the existing Floyd Hill interchange). <br /> <br />2 Relocate 13 miles of U.S. Highway 6 within Clear Creek Canyon. <br />Relocate U.S. Highway 6 through a tunnel from S.H. 119 to the U.S. <br />Highway 6/1-70 interchange at the base of Floyd Hill. Reconstruct <br />U.S. Highway 6/1-70 interchange to full direction interchange. <br /> <br />Relocate 13 miles of U.S. Highway 6 within Clear Creek Canyon. <br />Relocate U.S. Highway 6 through a tunnel from S.H. 119 to the <br />Hidden ValleY/I-70 interchange. <br /> <br />3 <br /> <br />'- <br /> <br />4 Redirect U.S. Highway 6 commuter and truck traffic from Clear <br />Creek Canyon to 1-70. Relocate S.H. 119 through a tunnel to the <br />Hidden ValleY/I-70 interchange. <br /> <br />5 <br /> <br />Redirect U.S. Highway 6 commuter and truck traffic from Clear <br />Creek Canyon to 1-70. Relocate S.H. 119 through a tunnel to the <br />U.S. Highway 6/1-70 interchange at the base of Floyd Hill. <br />Reconstruct the U.S. Highway 6/1-70 interchange at the base of <br />Floyd Hill to a full directional interchange. <br /> <br />6 Redirect U.S. Highway 6 commuter and truck traffic from Clear <br />Creek Canyon to 1-70. Relocate S.H. 119 to 1-70 at the Floyd Hill <br />Interchange. This alternative includes a bridge over the reservoir <br />(see Figure 1.1). <br /> <br />TABLE 3.2 <br /> <br />Estimated Construction Costs For Centennial Reservoir <br />Highway Relocations <br /> <br />Construction <br />Alternative No. Cost <br /> <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br /> <br />$232,000,000 <br />$264,000,000 <br />$259,000,000 <br />$108,000,000 <br />$112,000,000 <br />$ 84,000,000 <br /> <br />, <br />'-- <br /> <br />3-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.