Laserfiche WebLink
<br />;. <br /> <br />The maximum day water demands for Phase I, I I, and I I I are 0.81, 1.11, and <br />1.52 mi II ion gallons per day (MGD) respectively. <br /> <br />The water rights owned and controlled by the Town of Hotchkiss are adequate <br /> <br />for Phase I I' level of development. It is anticipated that storage water COn- <br /> <br /> <br />trolled by the Town will be utilized to supplement the flow of Leroux Creek <br /> <br /> <br />during winter periods. <br /> <br />Ground water investigations at Hotchkiss indicate that alluvial supplies are <br />unsatisfactory because of quality; however, it is believed that deep non-trib- <br />utary ground water is available in limited quantities. <br /> <br />! <br /> <br />A review of the water system and the quality of water furnished the customers <br />at Hotchkiss by the Colorado Department of Health, has pinpointed a critical <br />problem because of turbidity, color, and bacteriological quality. For this <br />reason, improvement of the Town water system to meet minimum municipal stan- <br />dards is a high priority item locally, regionally, and on the state level. <br /> <br />, <br /> <br />FACILITIES MASTER PLAN <br /> <br /> <br />A detailed facilities plan has been developed for the Town of Hotchkiss and <br /> <br /> <br />is presented in Chapter V of this report. Hotchkiss has a system based upon <br /> <br /> <br />surface water diversion many miles to the north of Town. The long water trans- <br /> <br /> <br />mission 1 ines, the poor condition of the water treatment plant, and the worn- <br /> <br /> <br />out distribution system, creates special problems for Hotchkiss in terms of <br /> <br /> <br />capital investment required. This Master Plan is based upon full utilization <br /> <br /> <br />of existing facilities wherever possible and maintaining components in service <br /> <br />for as long a time as practical so as to reduce the financial burden required <br />in the re-vamping of the water system. It is for this reason that the overall <br />master plan is divided into three phases with only the most necessary work <br />called for in Phase I. <br /> <br />~ <br /> <br />. <br />