My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00448
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00448
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:25 AM
Creation date
10/5/2006 11:55:52 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153345
Contractor Name
Hotchkiss, Town of
Contract Type
Loan
Water District
0
County
Delta
Bill Number
SB 77-35
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br />, <br /> <br />Fire flow capability in the Town does not meet normal fire fighting require- <br />ments and the quality of the water is sometimes inadequate, <br /> <br />Revamping of the Town water system is a high priority item in Hotchkiss. <br /> <br />Income generated by the water system has been inadequate. The Town has been <br /> <br /> <br />transferring revenue sharing funds into the water fund to supplement water <br /> <br /> <br />rent and tap fee income. <br /> <br />LAND USE <br /> <br />Delta County does not have land use zoning at the present time. The Hotch- <br /> <br /> <br />kiss municipal boundries include approximately 240 acres. Rural sprawl in <br /> <br /> <br />the Hotchkiss area is a problem. A good municipal water system would tend <br /> <br /> <br />to encourage new growth in the area to be contiguous to the Town of Hotchkiss. <br /> <br />~ <br /> <br />WATER <br /> <br />. <br /> <br />The municipal water system serves a total of 436 taps representing a popula- <br />tion of 950. Analysis of the water customers indicates a total equivalent <br />residential unit count of 535. Planning for the present and future potential <br />growth for the Town of Hotchkiss has resulted in three phases of planned de- <br />velopment ranging from 550 EQR for Phase I to 1,000 EQR for Phase II I as indi- <br />cated in the following table. <br /> <br />Phase 0 r <br />Level of <br />Development <br /> <br />EQR <br />550 <br /> <br />Population <br />per <br />EQR <br /> <br />1.8 <br /> <br />Population <br />Served <br /> <br />1,000 <br /> <br />II <br /> <br />750 <br /> <br />2;0 <br /> <br />1,500 <br /> <br />Comments <br /> <br />Approximate existing level <br />of development <br /> <br />50 per cent growth in pop- <br />ulation <br /> <br />Maximum design development <br /> <br />III <br /> <br />1,000 <br /> <br />2.5 <br /> <br />2,500 <br /> <br />to <br /> <br />, <br />
The URL can be used to link to this page
Your browser does not support the video tag.