Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />. An intermediate reduced pressure zone should be created in order to increase <br />pressure to some areas in South Morrison, and to some new area adjacent to the <br />south. <br /> <br />INITIAL CAPITAL IMPROVEMENT PROGRAM <br /> <br />Capital improvements identified by the Master Plan can be prioritized. Factors affecting <br />improvements timing include: <br /> <br />. Improve water quality and service reliability for existing customers <br />. Place Cooley Reservoir on-line <br />. Provide water for new development <br />. Availability of funds <br /> <br />A proposed initial CIP has been prioritized and estimated in Table IV-B. Note that this program <br />is considered to be accomplished within a time frame of about 5 to 7 years - and includes <br />utilization of Cooley Reservoir. <br /> <br />TABLE IV-B <br /> <br />INITIAL CAPITAL IMPROVEMENT PROGRAM <br /> <br />Item NO Improvement Item Approximate <br /> Budget 1996' <br /> Recommended First Priority Improvements. Existing Customers <br />1. Construct access bridge across Bear Creek near intake and $50,000.00 <br /> modifications to dam. <br />2. Replace the upper 800 lineal feet of 10-inch steel pipe on $260,000.00 <br /> the intake line with new 16-inch DIP. This includes <br /> construction of a new grit chamber and abandoning the <br /> existing sand trap and stilling basins. <br />3. Replace the approximately 1,000 lineal feet of 4-inch pipe $50,000.00 <br /> for the first reach from the Morrison Operating Reservoir to <br /> the treatment plant with new 14-inch DIP. <br /> <br />70-080.035:MSTR-PLN <br /> <br />IV-3 <br />