<br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Replace Structure 3, 4 & 5 $10,500 ea. = $31,500 <br />Structure 6 - Chute; we feel the chute could be abondoned and routed along the <br />south side of county road <br />1 structure $10,500 ea. = $10,500 <br />Replace.Structure 7 & 8 <br />2 ea. at $105,00 ea. = $21,000 <br />Replace Structure 9, 10, 11 & 12 <br />4 ea. at $10,500 ea. = $42,000 <br />Structure 13 is OK <br />Repair 14 & 16 <br />2 ea. at $1,000 ea. = $2,000 <br />Structure No. 15 to be removed. <br />Replace Structure 17 <br />1 ea. at $10,500 ea. = $10,500 <br />Replace Structure 18 <br />1 ea. at $10,500 = $10,500 <br />Repair 19 & 20 <br />1. ea. at $1,000 = $2,000 <br />Miscellaneous <br /> <br />$50,000 <br />TOTAL STRUCTURE REPLACEMENT COSTS = $180,000 <br /> <br />We, therefore, have an estimated rehabilitation cost using concrete lined ditch of <br /> <br /> <br />$2,602,000. Since all engineering will be done by the Soil Conservation Service, <br /> <br />all we need to add are funds for contract administration and legal fees. For this <br /> <br />study we will estimate this at three percent (3%) of the total construction costs. <br /> <br /> <br />For alternative No.2, this will be about $78,000. We, therefore, have a total <br /> <br />estimated cost of $2,680,000. As can be seen, this is higher than the $2,400,000 <br /> <br /> <br />available for the rehabilitation of this project. There would be areas which <br /> <br /> <br />could not be rehabilitated due to lack of funds. The areas which would have to <br /> <br /> <br />remain earthen would be picked on their existing conditions, with the best sections <br /> <br />remaining. Those reaches of ditch with extensive deterioration would be attended <br /> <br /> <br />to first. The remainder of the ditch which cannot be concrete lined under this <br /> <br /> <br />project, should be budgeted for as soon as possible. We recommend that the portion <br /> <br />of the ditch which must remain earthen be stripped, shaped and compacted until <br /> <br />the time it also can be reconstructed with concrete lining. <br /> <br />30 <br />