My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00434
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00434
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:44 AM
Creation date
10/5/2006 11:55:12 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153337
Contractor Name
Farmers Extension Ditch & Highland Lake Lateral Company
Contract Type
Loan
Water District
1
County
Weld
Bill Number
FSA
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />29 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1- General Excavating $ 4.50 per cubic yard <br />2. Compaction 4.50 per cubic yard <br />3. Import fill/No transportation .50 per cubic yard <br /> Transportation $30 per hour <br />4. Concrete lining 30.00 per L. F. <br />5. Grading and shaping 4.50 per cubic yard <br />6. Imported bedding materials .75 per cubic yard <br /> No transportation <br /> Transportation $30 per hour <br /> <br />We estimate the cost for the concrete lining of the ditch, excluding turnouts <br />and check structures to be: <br /> <br />1. Construct the new trench for the ditch and fill in existing ditch <br />with these materials <br />Area = 16.5 ft2 <br />Length = 58,000 ft. <br />Volume = 35,500 cu. yds. <br />Cost = 35,500 cu. yds. x 4.50 c~. yd. = $159,720 <br />2. Fill in remainder of ditch with i~ported material <br />Volume = 35,000 cu. yds. approximately <br />Estimated Cost = $5.00 per cu. yd.! x 35,000 cu. yds. = $175,000 <br />3. Compact fill is existing ditch <br />Volume = 70,000 cu. yds. <br />Cost = 4.50 x 70,000 cu. yds. =$315,000 <br />4. Precompact new ditch trench as necessary <br />Volume = 7,000 cu. yds. <br />Cost = 4.50 per cu. yd. x 7,000 cu. yds. = $31,500 <br />5. Construct ditch lining <br />Length = 58,000 <br />Cost = 58,000 x $30 per L.F. = $1,740,000 <br /> <br />For the check structures we have used the figures the Soil Conservation Service <br />used in their preliminary engineering report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.