Laserfiche WebLink
<br />.. <br />- <br /> <br />. <br /> <br />. <br /> <br />" <br /> <br />.,;. <br /> <br />The Contractor will review and categorize conditional, <br />decrees which are senior to those of the facilities under <br />consideration. A range of reasonable assumptions will be made, <br />in consultation with the State, about the future status of the <br />senior conditional decrees for use in system operation studies. <br /> <br />All' water rights work shall be performed in <br />consultation with the State. <br /> <br />Task 7 - Description of Existing System <br /> <br />Using the information and analyses from Tasks 4, 5 and <br />6 and the information to be developed in this task, the <br />Contractor will prepare a qualitative and quanitative description <br />of the existing water resource management system in the Cache la <br />poudre Basin. This description will include, at a minimum, the <br />following items: <br /> <br />a. <br /> <br />An inventory of the major water supply entities in the <br />Basin with present and projected water uses. Minor <br />entities will also be inventoried but may be grouped in <br />categories as appear to be suitable for purposes of <br />analysis. <br /> <br />.' <br /> <br />b. An inventory of all major water supply facilities and <br />structures in the Basin including transbasin diversion <br />structures. The inventory shall include type of <br />structure, location, owner, present utilization and <br />some indication of structural condition. <br /> <br />C. A description of the manner in which water rights are <br />presently administered in the Cache la poudre Basin to <br />include informal exchange agreements and procedures <br />used by the Division Engineer to manage direct flow and <br />storage rights on the River. <br /> <br />In gathering information for and preparing this <br />description, the Contractor shall consult with the Division One <br />Engineer, the District Three Water Commissioner and the major <br />water supply entities in the Basin. The Contractor shall also <br />review information compiled by the Colorado Water Resources <br />Research Institute. Finally, the Contractor shall consider any <br />foreseeable changes in water rights administration and future <br />operating conditions on the River. <br /> <br />Task 8 - Select Computer Simulation Model <br /> <br />In consultation with the State, the Contractor will <br />develop a computer simulation model or select an existing <br />computer simulation model to be used in simulating the hydrology <br />and operational aspects of the Cache la poudre River system and <br />the operation of the project alternatives under consideration. <br /> <br />-6- <br />