My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00425
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00425
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:25 AM
Creation date
10/5/2006 11:54:37 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153368
Contractor Name
Cache LaPoudre Water Development Study
Water District
0
County
Larimer
Bill Number
SB 81-439
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />. <br /> <br />. <br /> <br />.~\ <br /> <br />10. Formulate Preliminary Alternatives <br /> <br />24 <br /> <br />11. Evaluate Preliminary Alternatives <br /> <br />8 <br /> <br />12. Evaluate Selected Alternatives <br /> <br />34 <br /> <br />13. Report Preparation <br /> <br />1 2 <br /> <br />Total 140 <br /> <br />The estimated work effort in man-weeks for each task may be <br />revised to change emphasis among tasks. Such revisions shall be <br />subject to the procedures of paragraph 9 of the contract. <br /> <br />,~ask 1 - Project Aministration and Control <br /> <br />Por this task the Contractor shall: <br /> <br />~ <br /> <br />a. Prepare a detailed Plan of Study (POS) which shall <br />address, in detail, the study tasks, schedule, budget, <br />milestones, task products and coordination with the <br />State. <br /> <br />b. Coordinate and integrate the work of project <br />team members and subcontractors. <br /> <br />c. Monitor and control expenditures by task. <br /> <br />d. Make oral status reports to the CWCB staff not less <br />than every two weeks, with written status reports every <br />four weeks. <br /> <br />Task 2 - Meetings <br /> <br />The Contractor will participate in five one-day <br />meetings of the project advisory committee and will prepare <br />exhibits or displays, as appropriate, for these meetings. It is <br />anticipated that meetings also will be required with various <br />State and Federal agencies for information and data collection as <br />well as with the State for discussion of project-related matters. <br /> <br />Task 3 - Review of Existing Data <br /> <br />The Contractor shall review previous studies conducted <br />on the Cache la poudre River and shall utilize existing data <br />whenever possible. Published and unpublished data available from <br />agencies and institutions such as the Bureau of Reclamation, the <br />U.S. Army Corps of Engineers, the Colorado State Engineer's <br />Office, the U.S. Geological Survey, state universities, <br />municipalities and the Colorado Water Conservation Board will be <br />reviewed for possible use in the study. <br /> <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.