My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00424
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00424
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:25 AM
Creation date
10/5/2006 11:54:29 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153472
Contractor Name
San Miguel Water Conservancy District
Water District
0
County
San Miguel
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br />~. <br />( ) <br /> <br />.' <br />,-) <br /> <br />TASK E14.0 <br /> <br />DEMONSTRATION PLAN <br /> <br />Purnose: <br /> <br />Demonstrate the hypothetical operation of one selected alternative under two different <br /> <br />operating arrangements. <br /> <br />MethodoloIN: The hypothetical operation of one selected alternative will be demonstrated under two <br /> <br />operating arrangements: as separate systems cooperating through contractual arrangements <br /> <br />and as a single consolidated system. Hypothetical operations will be performed on a monthly <br /> <br />basis for one year using average year conditions over the period of April to October. Verbal <br /> <br />descriptions and numerical illustrations of these operations will be developed. The time and <br /> <br />cost estimate for performing this task was based on the assumption that Alternative G, being <br /> <br />the simplest alternative to demonstrate, would be used. If another alternative is selected <br /> <br />which involves significantly greater effort, Boyle will prepare and submit to the CWCB a scope <br /> <br />of work and budget for completion of this task. <br /> <br />The following work items are included in the demonstration plan task: <br /> <br />E14.1 Demonstrate Physical Ooeralion - The physical operation of one selected alternative under <br /> <br />both operating scenarios will be described verbally and illustrated numerically. Operations for <br /> <br />a single year using approximately average year conditions will be illustrated. All calculations <br /> <br />will be performed on a monthly basis. Water sources, storage locations, destinations for <br /> <br />ultimate use, and transfers between distribution systems will be accounted for. The possible <br /> <br />locations for measurement of flow and storage and potential water accounting systems <br /> <br />necessary for operations under each scenario will be described. <br /> <br />38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.