My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00424
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00424
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:25 AM
Creation date
10/5/2006 11:54:29 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153472
Contractor Name
San Miguel Water Conservancy District
Water District
0
County
San Miguel
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Products: <br /> <br />.c) <br /> <br />" <br />() <br /> <br />E14.2 Institutional Arranl!ements - Potential institutional arrangements which could be used to <br /> <br />implement operating procedures under e lch scenario will be briefly described. Preliminary <br /> <br />concepts for the potential allocation of new water and potential water marketing plans will be <br /> <br />formulated. These concepts will be strictly hypothetical, very preliminary, and represent only <br /> <br />one of many possibie strategies which could be devised. These concepts will be developed with <br /> <br />the intent of initiating discussions among study area participants. <br /> <br />E143 Develooment Conceot - A verbal description of a possible method for staging the development <br /> <br />of Alternative G, as an example, will be developed. These concepts will be very preliminary, <br /> <br />strictly hypothetical, and represent only one of many possible development strategies which <br /> <br />could be devised. These concepts will b" developed with the intent of initiating discussions <br /> <br />among study area participant);. No additional operational analyses will be performed to <br /> <br />develop this description. <br /> <br />Coordination and review efforts with the CWCB for this task are described in Task EI6.0. <br /> <br />Documentation of the results of this task is described in Task E17.0. <br /> <br />A brief task memorandum (approximately 3 pages) describing the institutional arrangements <br /> <br />required for operation of Alternative G WIder both operating scenarios and a summary of the <br /> <br />numerical illustration of system operatiolll: under both operating scenarios. <br /> <br />39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.