Laserfiche WebLink
<br />.\-~. <br /> <br />.r-. <br />~ ) <br /> <br />E13.4 Evaluation and ComDarison of all Alternatives - All alternatives will be evaluated and <br /> <br />compared to one another on the basis of increased yield, total project costs, annual project <br /> <br />costs, unit costs, and total annual costs as described above. The CWCB will establish the <br /> <br />criteria used to determine which alterna,ive is to be considered most promising for future <br /> <br />development. <br /> <br />Coordination and review efforts with the CWCB for this task are described in Task E16.0. <br /> <br />Documentation cf the results of this task ;'; described in Task EI7.0. <br /> <br />Products: <br /> <br />A brief task memorandum (approximately 3 pages) describing the evaluation criteria used and <br /> <br />summarizing the results of the financial evaluations of the alternatives. <br /> <br />37 <br />