My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00424
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00424
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:25 AM
Creation date
10/5/2006 11:54:29 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153472
Contractor Name
San Miguel Water Conservancy District
Water District
0
County
San Miguel
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br />r) <br />\. ~ <br /> <br />.-? <br /> <br />for engineering and administration will be added to these costs to estimate total capital costs. <br /> <br />Annual O,M&R costs for project facilities and for existing facilities will be estimated on the <br /> <br />basis of historical operating costs and comparison with similar facilities in the region. All costs <br /> <br />will be indexed to April 1988. Cost estimates developed for the initial Phase I Study will be <br /> <br />updated to April 1988 using Engineering News Record (ENR) or Bureau of Reclamation cost <br /> <br />index factors. No consideration of future inflation will be included. <br /> <br />E13.1.1 Financial Records - O,M&R costs will be estimated with the assistance of <br /> <br />financial records provided by each of the ditch companies. The financial <br /> <br />records which will be requested from the ditch companies will be annual <br /> <br />reports of financial examination or the equivalent. <br /> <br />E13.2 Uodale Costs - Cost estimates for the alternatives defined in subtasks E7.9 and E7.1O will be <br /> <br />updated to April 1988 levels for comparability with other alternatives using ENR or Bureau of <br /> <br />Reclamation cost index factors. <br /> <br />E133 Financial Analvsis . Total project capital costs from subtask E13.1 will be annualized using the <br /> <br />three financing scenarios listed above. Annual OM&R costs will be added to the annualized <br /> <br />project capital costs to estimate a total annual project cost for each alternative. The unit cost <br /> <br />per acre.foot of increased yield will be estimated for each alternative as total annual project <br /> <br />cost divided by t'Ie increased yield determined in subtask E12.9. Total annual costs will be <br /> <br />estimated as the sum of annual project costs and annual O,M & R costs for the existing <br /> <br />system. <br /> <br />36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.