Laserfiche WebLink
<br />Products: <br /> <br />eel <br /> <br />.0 <br /> <br />E7.9. Included will be a summary inventory and brief review of alternative reservoir and <br />diversion sites and other significant project elements pertaining to the off-stream storage <br /> <br />alternatives investigated in the previous studies. <br /> <br />Coordination and review with the CWCB for the work efforts of this task are described in <br /> <br /> <br />Task E16.0. Documentation of the results of this task are described in Task E17.0. <br /> <br />Task memorandt:m (approximately 3 pages) briefly describing the evaluation criteria used and <br /> <br /> <br />summarizing the findings of the technical evaluations of the alternatives. <br /> <br />33 <br />