My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00424
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00424
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:25 AM
Creation date
10/5/2006 11:54:29 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153472
Contractor Name
San Miguel Water Conservancy District
Water District
0
County
San Miguel
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~- <br />\ '1 <br />, <br /> <br />tit) <br /> <br />information previously obtained for the project area will be reviewed prior to the site visit. A <br /> <br />brief report of the geologic risks associated with the planned construction and preliminary <br /> <br />design information including probable material sources in sufficient detail to allow <br /> <br />construction costs to be estimated will be prepared. <br /> <br />E12.5 Preliminarv Desil!R Concents - Develop preliminary design concepts, for alternatives described <br /> <br />in subtasks E7.1 through E7.8, except E73, for the purpose of making BESTSM simulations. <br /> <br />These concepts will be limited to hydraulic capacities/geometry necessary to operate <br /> <br />BESTSM. No drawings will be prepared for this subtask. <br /> <br />E12.6 Simulation Models - Reservoir operation ximulation models of each alternative to be defined <br /> <br />in subtasks E7.1 - E7.8, except E73, will be developed through modification of BESTSM to fit <br /> <br />the particular requirements of each alternative. To the degree practicable, existing mcidels for <br /> <br />alternatives developed previously will be used. <br /> <br />E12.7 Test Models - The reservoir operation models developed in subtask E12.6 will be tested to <br /> <br />detect errors in program logic and coding. Model testing will be accomplished by simulating <br /> <br />operations for two to five year periods rather than the full period of study. <br /> <br />E12.8 Deline Alternative Doerations - Operational rules for the proposed and existing facilities <br /> <br />comprising the project alternatives will be developed based on the operational concepts <br /> <br />developed in subtasks E7.1 through E7.8, operating records obtained in Task E2.0, and <br /> <br />operating criteria used for the initial Phase I effort. These rules will be used for BESTSM <br /> <br />system simulations performed in subtask E12.9. <br /> <br />31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.