Laserfiche WebLink
<br />er <br />\ .' <br /> <br />.. <br />....... <br />I. ) <br /> <br />The following work items are included in the technical evaluation of alternatives task: <br /> <br />E12.1 Define Additional Proiect Elements - Defme, in consultation with the CWCB, project <br /> <br />elements which are associated with the pICoject alternatives defined in Task E7.0 (subtasks <br /> <br />E7.1 - E.78) which were not investigated previously. Included among these elements are <br /> <br />Beaver Canyon Reservoir, Beaver Canyon conveyance facilities, Beaver Canyon tunne~ <br /> <br />McCulloch diversion, and Old Nelson Ditcl:~ <br /> <br />E12.2 Data Gatherinl! - Readily available basic data and information pertaining to the additional <br /> <br />project elements defined in subtask E12.1 will be gathered at a reconnaissance level of detail <br /> <br />from the reports of previous investigations, available mapping, and communications with study <br /> <br />area participants. <br /> <br />E123 Field Investil!ati.m - Additional project element sites defined in subtask E12.1 will be <br /> <br />inspected in the field by Boyle personnel at a reconnaissance level of detail to determine <br /> <br />whether there are any apparent, surficial site conditions which might preclude construction of <br /> <br />the facilities or require extraordinary construction measures. <br /> <br />E12.4 Geotechnical Evaluation - A reconnaissance level review will be conducted for the Beaver <br /> <br />Canyon Reservoir site and Beaver Canyon mnveyance facilities route, if required as additional <br /> <br />work by the CWCB, and the McCulloch Creek diversion structure site and conveyance <br /> <br />facilities route through examination of available mapping, reports of previous investigations, <br /> <br />and a site inspettion visit to assess surficial conditions. The geological/geotechnical <br /> <br />30 <br />