My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00424
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00424
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:25 AM
Creation date
10/5/2006 11:54:29 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153472
Contractor Name
San Miguel Water Conservancy District
Water District
0
County
San Miguel
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />TASK E12.0 <br /> <br />Purnose: <br /> <br />.) <br />~. <br /> <br />~) <br /> <br />TECHNICAL EVALUATION OF ALTERNATIVES <br /> <br />Evaluate the project alternatives defmed in Task E7.0 (subtasks E7.1 - E7.8) at the same <br /> <br />reconnaissance level of detail as the alternatives presented in the Interim Report. unless <br /> <br />otherwise noted.. Evaluate project alternatives defined in Task E7.0 (subtasks E7.9, E7.10) at <br /> <br />a screening level of detail. Summarize alternatives in Task E7.0 (subtask E7.11) for inclusion <br /> <br />in the FmaI Phase I Report. <br /> <br />Methodolol!V: For alternatives defined in subtasks E7.1 - E7.8, new associated project elements will be <br /> <br />defined by Boyle in consultation with the CWCB. Project elements will be evaluated at a <br /> <br />reconnaissance level of detail for inclusion as part of the project alternatives. These <br /> <br />alternatives will be evaluated in terms of their ability to increase full season irrigation water <br /> <br />supplies. Unless otherwise specified, the procedures, assumptions, and techniques used <br /> <br />previously in the technical evaluations of alternatives conducted for the study by Boyle will be <br /> <br />used for these analyses. <br /> <br />For alternatives to be investigated as defmed in sub tasks E7.9 and E7.10, information from the <br /> <br />reports of previous investigations will be reviewed. Costs associated with the alternatives will <br /> <br />be updated in Task E13.0. The alternatives will be summarized in the Fmal Phase I Report. <br /> <br />CWCB will be informed if apparent issues are discovered that would warrant additional <br /> <br />analysis. If directed by the CWCB, Boyle will prepare a scope and budget covering the <br /> <br />additional work effort for CWCB review and directions. <br /> <br />Alternatives defl.1ed in subtask E7.11 will be summarized for inclusion in the Fmal Phase I <br /> <br />Report. No analysis of alternatives will be required. <br /> <br />29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.