Laserfiche WebLink
<br />.c! <br /> <br />.,-- <br />. \ <br />t.. I <br /> <br />Ell.4 Review bv Barrv Cooke - The potential reservoir sites, conduit route, and site vicinity will be <br /> <br />inspected in the field by Barry Cooke during a one-day site visit. Cooke will address site, <br /> <br />design and construction issues regarding the hydroelectric facilities. Cooke will also perform <br /> <br />an oversight review of the geological/geOf.echnical conditions investigations report developed <br /> <br />in subtask Ell.L <br /> <br />Coordination and revievl efforts with the CWCB for this task are described 10 Task E16.0. <br /> <br />Documentation of the results of this task are described in Task E17.0. <br /> <br />Products: <br /> <br />Task memorandum (approximately 10 pages) briefly describing the additional investigations of <br /> <br />the San Miguel Canyon Hydropower Project undertaken and summarizing the fmdings of <br /> <br />these investigations. <br /> <br />28 <br />