My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00424
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00424
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:25 AM
Creation date
10/5/2006 11:54:29 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153472
Contractor Name
San Miguel Water Conservancy District
Water District
0
County
San Miguel
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.Cl <br /> <br />.~ <br />, , <br />, ' <br /> <br />E73 A reservoir in Beaver Canyon (Beaver Canyon Reservoir) immediately downstream <br /> <br />of the confluence of Turner and Beaver Creeks providing a new source of water and <br /> <br />additional storage capacity for the, Gurley and Cone collection and regulatory systems. <br /> <br />No expansion of Cone Reservoir will be considered. Initially. very approximate <br /> <br />estimates of embankment and conveyance facilities costs and average annual yields at <br /> <br />this site will be determined. Tile findings of these cursory investigations will be <br /> <br />reviewed with the CWCB, If the CWCB deems further investigations necessary, <br /> <br />Boyle will prepare and submit to the CWCB a scope of work and budget to perform <br /> <br />the work. <br /> <br />E7.4 A diversion structure on McCulloch Creek in the vicinity of the former point of <br /> <br />diversion of the Old Nelson Ditch providing a new source of water for the Gurley and <br /> <br />Cone collection and regulatory systems. Expansion of Cone Reservoir will be <br /> <br />considered. <br /> <br />E7.5 A smaller Lilylands Reservoir Eq>ansion (to approximately 1200 acre,feet storage) <br /> <br />along with improvements in the collection and distribution ditches. <br /> <br />E7.6 Revisions to Alternative G as reported in the Interim Report to incorporate changes <br /> <br />which will allow direct comparisons of this alternative with all new alternatives. <br /> <br />E7.7 Revisions to Alternative L as rep'Jrted in the Interim Report to incorporate changes <br /> <br />which will allow direct comparisons of this alternative with all new alternatives. <br /> <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.