Laserfiche WebLink
<br />~} <br /> <br />~ <br /> <br />EVALUATION OF ADDmONAL PRO,JECf ALTERNATIVES <br /> <br />TASK E7.0 <br /> <br />DEFINITION OF ALTERNATIVES <br /> <br />Pumose: <br /> <br />Defllle the new alternatives to be investigated and what revisions to Alternatives G. L, and W <br /> <br /> <br />as presented in the Interim Report (dated February 1988) will be made, <br /> <br />Methodolol!V: Describe the alternatives to be evaluated, the level of analysis, and the operating concept. This <br /> <br /> <br />definition will be used as a basis for conducting the work described in subsequent tasks. <br /> <br /> <br />Analysis of alternatives is not included as part of this task. <br /> <br />Alternatives to be evaluated at the same reconnaissance level of detail as used for the Interim <br /> <br />Report are as follows: <br /> <br />E7.1 A small Marie Scoll Reservoir (less than 15,000 acre,feet storage) providing a new <br /> <br /> <br />source of water and additional storage capacity for the Gurley and Cone collection <br /> <br /> <br />and regulatory systems. No expansion of Cone Reservoir will be considered. <br /> <br />E72 A large Marie Scoll Reservoir (more than 15.000 acre,feet storage) providing a new <br /> <br /> <br />source of water and additional storage capacity for the Gurley, Cone, and Lilylands <br /> <br /> <br />collection and regulatory systems. No expansion of the Cone or Lilylands Reservoirs <br /> <br /> <br />will be considered. If the CWCB determines that sufficient evidence regarding Marie <br /> <br /> <br />Scott Reservoir has been obtained from investigation of the alternatives defined in <br /> <br /> <br />subtasks E7.1 and E7.8, the investigation of this alternative can be stopped at the <br /> <br /> <br />direction of the CWCB. <br /> <br />15 <br />