My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00424
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00424
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:25 AM
Creation date
10/5/2006 11:54:29 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153472
Contractor Name
San Miguel Water Conservancy District
Water District
0
County
San Miguel
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />~ <br /> <br />E7,8 Revisions to Alternative W as reported in the Interim Report to incorporate changes <br /> <br /> <br />which will allow direct comparisons of this alternative with all new alternatives. <br /> <br />A brief overview and cost estimate update will be made for the following alternatives. No <br /> <br /> <br />additional analysis will be made unless directed by CWCB, If directed by CWCB, Boyle will <br /> <br /> <br />prepare scope and budget for the additional work. Boyle will not proceed with the additional <br /> <br /> <br />work with out authorization from CWCB. <br /> <br />E7,9 Wheeler Draw Reservoir /HamiIton Creek Hydropower addition to the Lilylands <br /> <br /> <br />System reported by Western Engineers. Inc. in their 1985 report. <br /> <br />E7,10 Maverick Draw site reported by Western Engineers, Inc. in their 1985 report. <br /> <br />Off-stream storage alternatives described in the reports of previous investigations will be <br /> <br /> <br />identified, No analysis will be made. As part of subsequent tasks these alternatives will be <br /> <br /> <br />listed and briefly described in the Fmal Phase I Report with report source sited. A brief <br /> <br /> <br />summary description characterizing mainstem storage sites investigated will be prepared. <br /> <br />E7.11 Review Reoorts - Review the three reports listed below and compile a list and brief <br /> <br /> <br />description of alternatives and sites addressed therein relating to the high elevation <br /> <br /> <br />collection system. <br /> <br />u.s. Bureau of Reclamation, February 1966, "Feasibility Report, San Miguel Project, <br />Colorado", <br /> <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.