Laserfiche WebLink
<br />~ <br /> <br />~ <br /> <br />E7,8 Revisions to Alternative W as reported in the Interim Report to incorporate changes <br /> <br /> <br />which will allow direct comparisons of this alternative with all new alternatives. <br /> <br />A brief overview and cost estimate update will be made for the following alternatives. No <br /> <br /> <br />additional analysis will be made unless directed by CWCB, If directed by CWCB, Boyle will <br /> <br /> <br />prepare scope and budget for the additional work. Boyle will not proceed with the additional <br /> <br /> <br />work with out authorization from CWCB. <br /> <br />E7,9 Wheeler Draw Reservoir /HamiIton Creek Hydropower addition to the Lilylands <br /> <br /> <br />System reported by Western Engineers. Inc. in their 1985 report. <br /> <br />E7,10 Maverick Draw site reported by Western Engineers, Inc. in their 1985 report. <br /> <br />Off-stream storage alternatives described in the reports of previous investigations will be <br /> <br /> <br />identified, No analysis will be made. As part of subsequent tasks these alternatives will be <br /> <br /> <br />listed and briefly described in the Fmal Phase I Report with report source sited. A brief <br /> <br /> <br />summary description characterizing mainstem storage sites investigated will be prepared. <br /> <br />E7.11 Review Reoorts - Review the three reports listed below and compile a list and brief <br /> <br /> <br />description of alternatives and sites addressed therein relating to the high elevation <br /> <br /> <br />collection system. <br /> <br />u.s. Bureau of Reclamation, February 1966, "Feasibility Report, San Miguel Project, <br />Colorado", <br /> <br />17 <br />