My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00424
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00424
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:25 AM
Creation date
10/5/2006 11:54:29 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153472
Contractor Name
San Miguel Water Conservancy District
Water District
0
County
San Miguel
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Products: <br /> <br />.-i <br /> <br />~ <br /> <br />The cost estimates developed for Tasks 4 and 5 are based on the <br />assumption that the field work by Boyle personnel for both tasks will be <br />conducted over a two week period involving a single trip per person. <br /> <br />Compiled data base of application methods and estimated efficiencies in <br />digital and drafted form, <br /> <br />5) DISTRIBUTION FACILITIES INSPECTION <br /> <br />Purpose: <br /> <br />Methods: <br /> <br />Products: <br /> <br />Inspect the distribution systems of the Lone Cone and Farmers' <br />companies to identify maintenance concerns, locations for additional <br />headgates, and potential system interconnection locations, <br /> <br />Boyle, CWCB and SCS per~;onnel accompanied by ditch company <br />representatives will inspect the key areas of the distribution systems of <br />the Lone Cone and Farmers' companies, Areas of concern regarding <br />maintenance. locations where additional headgates should be installed, <br />and potential locations for interconnecting the systems will be noted and <br />documented. <br /> <br />The cost estimate developed for this task is based on an assumption of <br />substantial manpower assistance from the other cooperating entities, <br />Should this assistance not materialize to the degree anticipated, Boyle <br />and the CWCB will prioritize the work effort to concentrate resources <br />toward accomplishing the primary objectives of the task, Prior to <br />commencing' work on this task, a work plan and schedule will be <br />developed to coordinate the ac:tivities of all participants. The work plan <br />will define the specific items to be accomplished based on the available <br />manpower provided by the SCS and Extension, <br /> <br />The cost estimates developed for Tasks 4 and 5 are based on the <br />assumption that the field work by Boyle personnel for both tasks will be <br />conducted over a two week period involving a single trip per person, <br /> <br />Data, mapping and documentation to form basis for recommendations <br />for maintenance, headgate instclllation, and system interconnection, <br /> <br />6) STREAM GAGE INSTALLATION AND DATA COLLECTION <br /> <br />Purpose: <br /> <br />Methods: <br /> <br />Coordinate with ditch company representatives regarding locations for <br />installation of streamgages and streamflow data collection procedures, <br /> <br />Boyle and CWCB personnel will consult with ditch company <br />representatives to assist in s,election of locations for installation of <br />continuous recording streamgages, Assistance will also be provided in <br />the development of data collElction and reduction procedures, The <br />consultations will be provided via telephone and in the study area during <br />the field data collection or study meeting trips, ' <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.