Laserfiche WebLink
<br />Methods: <br /> <br />Products: <br /> <br />.. <br /> <br />e." <br />(I <br /> <br />\ <br /> <br />The Board of Directors of the Lone Cone and Farmers' ditch companies <br />in cooperation with their shareholders and assisted by SCS. BOR and <br />Extension personnel will estimate the crops grown or most probably <br />grown in their service areas. The information will be provided at the level <br />of detail available, data by quarter section is preferred, and at no greater <br />detail than quarter,quarter section. This information will be marked on <br />the 7.5 minute USGS Quadrangle Maps or the equivalent provided to the <br />ditch companies, The marked,up maps will be returned to Boyle for <br />review, data compilation, and drafting, <br /> <br />Compiled data base of cropping pattern in digital and drafted form, <br /> <br />4) ON.FARM IRRIGATION PRACTICES <br /> <br />Puroose: <br /> <br />Methods: <br /> <br />Compile information describing the on,farm irrigation practices used on <br />the lands served by the Lone Cone and Farmers' ditch companies. <br /> <br />The Board of Directors of the Lone Cone and Farmers' ditch companies <br />in cooperation with their shareholders and assisted by SCS, Extension, <br />and BOR personnel will inventory the type of on,farm irrigation practices <br />currently used in the service area, The primary information of interest is <br />application method, irrigation cycle, and scheduling methods used, The <br />application method information will be marked on the 7.5 minute USGS <br />Quadrangle Maps or the equivalent provided to the ditch companies, <br />The other information will be provided in summary form by farm, <br />referenced to the maps. The marked,up maps and summaries will be <br />returned to Boyle for review. data compilation, and drafting, The SCS will <br />be asked to assist Boyle in assigning representative efficiencies to the <br />irrigation practices considering factors of slope and soil type in <br />conjunction with application methods, <br /> <br />Prior to initiation of the field work associated with Tasks 4 and 5, one <br />member of Boyle's senior staff will make a one day trip to the study area <br />to review data collected to date, coordinate study efforts, and develop a <br />sampling strategy for collection of the on,farm irrigation practices <br />information. <br /> <br />The cost estimate developed for this task is based on an assumption of <br />substantial manpower assistance from the other cooperating entities (4 <br />weeks BOR technician). Should this assistance not materialize to the <br />degree anticipated, Boyle and the CWCB will prioritize the work effort to <br />concentrate resources toward accomplishing the primary objectives of <br />the task, Prior to commencing work on this task, a work plan and <br />schedule will be developed to coordinate the activities of all participants, <br />The work plan will define the specific items to be accomplished based on <br />the available manpower provided by the SCS. Extension, and BOR. <br /> <br />3 <br />