My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00424
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00424
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:25 AM
Creation date
10/5/2006 11:54:29 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153472
Contractor Name
San Miguel Water Conservancy District
Water District
0
County
San Miguel
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Products: <br /> <br />,,) <br /> <br />., <br /> <br />Summary memorandum produced by Boyle recording streamgage <br />locations selected and data collection and reduction procedures <br />recommended. <br /> <br />7) GEOTECHNICAL INVESTIGATION AT LONE CONE DAM <br /> <br />Purpose: <br /> <br />Methods: <br /> <br />Products: <br /> <br />8) MEETINGS <br /> <br />Purpose: <br /> <br />Methods: <br /> <br />Provide supplementary geotechnical information to allow evaluation of <br />potential Lone Cone ~mbankment enlargement. <br /> <br />Information from seven borings and several test pits are available from <br />the feasibility report for expansion of Lone Cone Reservoir. Examination <br />of the existing data il1dicates that additional information would be very <br />valuable in defining some unknown conditions, Included are the <br />following: <br /> <br />o One centerline crest boring in the left abutment and one boring <br />drilled downstteam. near the outlet works; <br /> <br />o Packer tests for permeability and shear strength evaluations for <br />each of these borings, <br /> <br />The geotechnical borings will be conducted by the BaR with input from <br />Boyle and the CWCB with regard to sampling location and procedures, <br />Chen, Northern will be retained by Boyle to log the borings, perform <br />material testing and produce a report of summary results. Boyle and the <br />CWCB will review the information gathered. The BaR will obtain all <br />permits required for borings and borrow investigations. <br /> <br />Summary report of data and results of the geotechnical investigation. <br /> <br />Promote communications among all involved parties, transfer <br />information, and facilitate the completion of the study efforts, <br /> <br />Meetings between Boyle and CWCB will be held for study coordination <br />purposes and review of study findings and procedures, Meetings with <br />other involved parties and local study participants will be held to <br />coordinate activities, exchange ideas, and report study efforts, <br /> <br />The following meetings between Boyle and the CWCB in the offices of <br />Boyle or the CWCB are anticipated: <br /> <br />Initiate Efforts: one four-hour meeting <br />Progress Report: one one,hour meeting <br />Report Review: one two,hour meeting <br />Conclusion of Efforts: one two,hour meeting <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.