Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />~. <br /> <br />'- <br /> <br />. <br /> <br />. <br /> <br />RECOMMENDATIONS <br /> <br />1. The Town of Silt is presently constructing certain water <br />facilities to correct deficiencies in the system~ These <br />initial phase water facilities include new horizontal <br />wells to replace the existing infiltration galleries, <br />a raw water lift station to correct the hydraulic in- <br />adequacies of the supply system and a 12 inch water main <br />construction. <br /> <br />2. We recommend that the Town acquire additional senior water <br />rights. <br /> <br />3. As second phase construction (estimated project cost <br />$1,400,000), we recommend that the Town construct the <br />following facilities: <br /> <br />A. A new clearwell, pumping and chlorination station <br />of 750 gallons per minute capacity. <br /> <br />B. A 800,000 gallon storage tank at elevation 5680. <br />This will supply adequate pressure for health and <br />fire protection demands. <br /> <br />C. A 14" transmission main from the distribution system <br />to the storage tank. <br /> <br />D. A backbone water distribution system consisting of <br />l2", 8" and 6" water mains to provide c~apacity to <br />meet demands. <br /> <br />E. Meters for all services to reduce water demand. <br /> <br />F. A 12" parallel water main crossing the Colorado River <br />to provide system redundancy. <br /> <br />~ ~--- -~ -- <br />