Laserfiche WebLink
<br />., <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />. <br /> <br />-~ <br /> <br />--------- ~-- <br /> <br />. <br /> <br />. <br /> <br />G. A new footbridge across one channel of the Colorado <br />River to the water supply facilities on the island. <br /> <br />4. <br /> <br />As future construction, we recommend that the Town complete <br />construction of all facilities to meet the projected water <br />demands. These consist of: <br /> <br />A. Increasing the capqcity of the raw water lift station <br />and pumping station as- demand increases from 750 gpm <br />to 1250 gpm. <br /> <br />B. Increase storage capacity from 800,000 gallons to <br />3,000,000 gallons as demand increases. <br /> <br />C. Replace all existing 4 inch and smaller water lines <br />with 6 inch or larger water mains and provide additional <br />looping. <br /> <br />D. Expansion of the Town onto Silt Mesa will require an <br />additional pressure zone with a pump station, distri- <br />bution system and storage. <br /> <br />5. <br /> <br />We recommend that the Town develop and implement a <br />financial and revenue program to finance future construc- <br />tion and operation and maintenenace costs. <br /> <br />----~-- <br />