My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00406
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00406
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:24 AM
Creation date
10/5/2006 11:53:33 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0004X
Contractor Name
Green Mountain Exchange Project CWRDA
Contract Type
Loan
Water District
0
County
Grand
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />LIST OF TABLES <br /> <br />TABLE PAGE <br />2.1 Reservoir Sites and Capacities Selected for Reconnaissance <br /> Investigation 2-6 <br />3.1 Average Annual Transmountain Diversion Demands (1000 af/yr) 3-7 <br />3,2 Estimated Irrigation Diversions for Major Water Rights Upper <br /> Colorado River Basin (1951-1983 Average Annual) 3-9 <br />3.3 Estimated Annual In-Basin Municipal Demands Upper Colorado <br /> River Basin 3-10 <br />3.4 Projects/Facilities included in Moderate and High-Future-Level <br /> Use Scenarios 3-13 <br />3.5 Demand by Category of Use for Development Scenarios 3-14 <br />4.1 Existing Reservoirs 4-3 <br />4.2 Instream Flow Requirements 4-6 <br />4.3 Water Rights Summary for Project Reservoirs 4-7 <br />4.4 Comparison Between Average Annual Recorded and Simulated <br /> Flows (1973-1983) 4-8 <br />4.5 Green Mountain Reservoir Estimated Annual Release Requirement <br /> for CBT Replacement and In-Basin Uses (Water Years 1951-1983) 4-11 <br />4.6 Green Mountain Exchange Project Average Annual Yield (1000 af/yr) 4-13 <br />4.7 Estimated Reservoir Firm Annual Yield Under Various Scenarios <br /> (1000 af/yr) 4-17 <br />5.1 Wolford Mountain Site A' Summary of Estimated Annual Operation Costs 5-9 <br />5.2 Wolford Mountain Site A' Dam and Reservoir Summary of Estimated <br /> Construction Quantities and Costs 5-10 <br />6.1 Wolford Mountain Site C Dam and Reservoir Summary of Estimated <br /> Construction Quantities and Costs 6-9 <br /> - <br />7.1 Red Mountain Dam and Reservoir'Summary of Estimated Construction <br /> Quantities and Costs 7-8 <br />7.2 Hydropower Addition at Red Mountain Dam Summary of Estimated <br /> Construction Quantities and Costs 7-9 <br />7.3 Red Mountain Dam and Reservoir Summary of Estimated Annual <br /> Operation Costs 7-9 <br /> - <br />8.1 Azure Dam and Reservoir Summary of Estimated Construction <br /> Quantities and Costs 8-9 <br />8.2 Hydropower Addition at Azure Dam and Reservoir Summary of Estimated <br /> Construction Quantities and Costs 8-10 <br />8.3 Azure Dam and Reservoir Summary of Estimated Annual Operation Costs 8-11 <br /> <br />iv <br />
The URL can be used to link to this page
Your browser does not support the video tag.