Laserfiche WebLink
<br />TABLE OF CONTENTS (continued) <br /> <br />11.0 <br /> <br />GREEN MOUNTAIN RESERVOIR TO DILLON RESERVOIR CONVEYANCE <br />SYSTEM <br />11.1 LOCATION <br />11.2 FLOW CAPACITY <br />11.3 ROUTE AND GEOTECHNICAL CONSIDERATIONS <br />11.4 PUMP STATIONS <br />11.5 PIPELINE <br />11.6 CONVEYANCE SYSTEM OPERATION <br />11.7 SUMMARY OF ESTIMATED CONSTRUCTION AND OPERATION COSTS <br /> <br />12.0 <br /> <br />HYDROPOWER EVALUATION <br />12.1 PROJECT IMPACT ON GREEN MOUNTAIN HYDROPOWER <br />12.2 HYDROPOWER POTENTIAL OF PROJECT RESERVOIRS <br /> <br />13.0 <br /> <br />ALTERNATIVE COMPARISONS <br />13.1 JOINT-USE RESERVOIRS <br />13.2 REPLACEMENT CAPABILITY OF THE PROJECT RESERVOIRS <br />13,3 CAPITAL AND TOTAL INVESTMENT COSTS <br />13.4 YEARLY DEBT SERVICE AND OPERATING COSTS <br />13.5 COST AND YIELD COMPARISONS <br />13.6 PROJECT DEVELOPMENT <br /> <br />14.0. REFERENCES <br /> <br />APPENDIXES (Under Separate Cover) <br />A. HYDROLOGIC ANALYSIS <br />B. PRELIMINARY DAM DESIGN, RESERVOIR AND CONVEYANCE SYSTEM <br />C. SUMMARY OF GEOTECHNICAL EXPLORATION <br /> <br />iii <br /> <br />PAGE <br /> <br />11-1 <br />11-1 <br />11-1 <br />11-1 <br />11-2 <br />11-6 <br />11-9 <br />11-13 <br /> <br />12-1 <br />12-1 <br />12-2 <br /> <br />13-1 <br />13-1 <br />13-2 <br />13-6 <br />13-6 <br />13-6 <br />13-10 <br /> <br />14-1 <br />