My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00406
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00406
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:24 AM
Creation date
10/5/2006 11:53:33 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0004X
Contractor Name
Green Mountain Exchange Project CWRDA
Contract Type
Loan
Water District
0
County
Grand
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> LIST OF TABLES (continued) <br /> TABLE PAGE <br /> 9.1 High Wolcott Dam and Reservoir Summary of Estimated Construction <br /> Quantities and Costs 9-11 <br /> 9.2 Low Wolcott Dam and Reservoir Summary of Estimated Construction <br /> Quantities and Costs 9-12 <br /> 9.3 High Wolcott Dam and Reservoir Summary of Estimated Annual <br /> Operation Costs 9-13 <br /> ,9.4 Low Wolcott Dam and Reservoir Summary of Estimated Annual <br /> Operation Costs 9-13 <br />...., <br /> 10.1 Una Dam and Reservoir Summary of Estimated Construction Quantities <br /> and Costs 10-9 <br />- 10.2 Hydropower Addition at Una Dam and Reservoir Summary of Estimated <br />; <br /> Construction Quantities and Costs 10-10 <br /> 10.3 Una Dam and Reservoir Summary of Estimated Annual Operation Costs 1 0-11 <br /> 11.1 Estimated Sizes of Surge Control Devices 11-8 <br /> 11.2 Range of Conveyance System Flows in AF Per Year To Meet Average <br /> Supplemental Water Requirement of Dillon Reservoir 11-10 <br /> 11.3 Estimated Billable Energy Demand and Average Energy Consumption 11-11 <br /> 11.4 8000 af Conveyance System Summary of Estimated Construction <br /> Quantities and Costs 11-15 <br /> 11.5 12,000 af Conveyance System Summary of Estimated Construction <br /> Quantities and Costs 11-16 <br /> 11.6 Hydropower Retrofit at Green Mountain Dam Summary of Estimated <br /> Construction Quantities and Costs 11-17 <br /> 11.7 8000 af Conveyance System Summary of Estimated Annual Operation <br /> Costs 11-18 <br /> 11.8 12,000 af Conveyance System Summary of Estimated Annual Operation <br /> Costs 11-18 <br /> 12.1 Summary of Estimated Hydropower Plant Costs 12-4 <br /> 12.2 Projected Hydropower Generation and Estimated Production Cost 12-4 <br /> 13.1 Joint-Use Reservoir Alternatives 13-1 <br /> 13.2 Replacement Reservoir Alternatives for Green Mountain <br /> Exchange Project 13-2 <br /> 13.3 Green Mountain Exchange Project Yield with Alternative <br /> Replacement Reservoir(s) 13-3 <br /> 13.4 Summary of Estimated Investment Costs 13-5 <br /> 13.5 Summary of Yearly Debt Service and Average Annual Operating Costs 13-7 <br /> 13.6 Estimated Cost of Joint-Use Reservoir Yield 13-8 <br /> 13.7 Estimated Cost of Replacement Reservoir Yield 13-9 <br /> 13.8 Estimated Cost of Conveyance System Water Transfer 13-11 <br /> 13.9 Cost of Exchange Project Water Available to Roberts Tunnel 13-12 <br /> <br />v <br />
The URL can be used to link to this page
Your browser does not support the video tag.