My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00406
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00406
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:24 AM
Creation date
10/5/2006 11:53:33 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0004X
Contractor Name
Green Mountain Exchange Project CWRDA
Contract Type
Loan
Water District
0
County
Grand
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />TABLE S.4 <br /> <br />JOINT-USE RESERVOIR ALTERNATIVES AND <br />COMPARATIVE UNIT COST OF YIELD <br /> <br /> FIRM TOTAL 2) UNIT <br /> RESERVOIR ANNUA~ COST COST OF <br />JOINT-USE CAPACITY YIELD 1 PER YEAR YIELD 3) <br />RESERVOIR (af) (af/yr) ($1,000,000) ($/af) <br />Wolford Mountain A' 120,000 40,000 7.1 $180 <br />wfColo. diversion 120,000 49,000 10.4 210 <br />Wolford Mountain C 60,000 25,000 3.9 160 <br />Red Mountain 140,000 56,000 14.2 250 <br />Azure 85,000 48,000 12.3 260 <br />, <br /> <br />-' <br /> <br />......J <br /> <br />1) Firm annual yield is defined as the quantity of water that can be supplied every year without <br />any shortage during the study period of 1951 through 1983. Demands on the Joint-Use <br />Reservoirs are based on a high future-level of water development, without pumpback to <br />Dillon Reservoir from Green Mountain Reservoir. <br /> <br />2) <br /> <br />Total cost per year is the sum of yearly debt service, average electrical power and other <br />operating costs from Table 5.3. <br /> <br />3) <br /> <br />Estimated cost per acre-foot of firm reservoir yield during a year of average operating costs. <br /> <br />........ <br /> <br />Both the conveyance system cost and the costs of selected Replacement Reservoirs must be <br />combined to indicate the total cost of additional water made available at Dillon Reservoir. This is <br />presented in Table 5.5. The Exchange Project Yield is the increased average annual yield to the <br />Roberts Tunnel Collection System which results from operation of the pumpback with the <br />Conveyance System and the Replacement Reservoir(s). <br /> <br />........ <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.