My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00406
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00406
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:24 AM
Creation date
10/5/2006 11:53:33 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0004X
Contractor Name
Green Mountain Exchange Project CWRDA
Contract Type
Loan
Water District
0
County
Grand
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ALTERNATIVE COMPARISONS <br />Single reservoirs of this Study were analyzed for their ability to meet Joint-Use Reservoir <br />requirements. These single reservoirs and combinations of reservoirs were also analyzed for their <br />ability to supply the greater yields necessary to meet Replacement Reservoir requirements based <br />upon the yield of Green Mountain Reservoir. A reservoir could initially serve Joint-Use Reservoir <br />requirements and later, in combination with additional constructed reservoir(s) also serve to meet <br />water exchange project requirements. <br /> <br />Joint-Use Reservoir Proiect: Yields from Wolford Mountain A' and C, Red Mountain and <br />Azure Reservoirs appear to be within range of the objective 30,000 af of annual yield for a Joint-Use <br />Reservoir. Comparative unit costs of yield from Joint-Use Reservoirs are presented in Table S.4. <br /> <br />Green Mountain Exchanae Proiect: For Replacement Reservoir alternatives, analyses were <br />made of Wolcott Reservoir and combinations of reservoirs including Wolcott (Eagle) and Red <br />Mountain, Wolcott (Eagle) and Azure, Red Mountain and Una, and Wolford Mountain A' and Una <br />Reservoirs. <br /> <br />Two of the reservoir combinations, Red Mountain with Una, and Wolford Mountain A' with <br />Una, are shown on Table S.1 as being capable of fully replacing the 144,000 af yield of Green <br />Mountain Reservoir. Other reservoirs and reservoir combinations would only partially replace Green <br />Mountain Reservoir. In these cases, a portion of the capacity of Green Mountain Reservoir would <br />continue to serve its original function. <br /> <br />In order to compare alternatives in this study, it was assumed that the yield of Replacement <br />Reservoir(s) could be exchanged for an equal quantity of yield from Green Mountain Reservoir, The <br />actual quantities of exchange may differ from this Study depending upon the institutional <br />arrangements between the interested parties. <br /> <br />,- <br /> <br />r- <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.