Laserfiche WebLink
<br /> TABLE 5.5 <br /> COST OF EXCHANGE PROJECT WATER <br /> AVAILABLE TO ROBERTS TUNNEL <br /> AVERAGE 2) EXCHANGE TOTAL 3) UNIT 4) <br />PROJECT 1) CONVEYANCE PROJECT COST COST OF <br />REPLACEMENT SYSTEM FLOW YIELD PER YEAR WATER <br />RESERVOIR(S) (1000 af/yr) (1000 af/yr) ($1,000,000) ($/af) <br />Wolcott w/diversion from <br />Eagle & Colo. 113 119 $ 93.8 $ 790 <br />Red Mountain & Una 119 124 68.4 550 <br />Una & Wolford Mountain A' 119 124 64.7 520 <br />w/Colo. diversion <br />Azure & Wolcott 87 101 61.4 610 <br />w/Eagle diversion <br />Red Mountain & Wolcott 81 93 62.7 670 <br />w/Eagle diversion <br /> <br />1) Diversion involves pumping from Colorado R. or Eagle R. or both rivers, as cited. <br /> <br />2) The 8000 af/mo conveyance system was combined with the Azure-Wolcott and Red <br />Mountain-Wolcott replacement reservoirs. The 12,OOOaf/mo system was combined with the <br />Wolcott/Eagle-Colo., Red Mountain-Una and Una-Wolford A' replacements reservoirs. <br /> <br />3) Total cost per year is the sum of yearly debt service, average electrical power and other <br />operating costs from Table S.3 for the listed reservoir(s) and the corresponding conveyance <br />system. <br /> <br />4) Estimated cost per acre-foot of project water delivered in a year of average operating costs. <br /> <br />In addition to supplying water to Dillon Reservoir by pumping from Green Mountain <br />Reservoir, the water exchange concept would allow water to be retained in Dillon Reservoir that <br />under current water rights priorities must be released to Green Mountain Reservoir. It should be <br />noted that the estimated average annual project yields differ from the firm yields expected from the <br /> <br />11 <br />