My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00405
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00405
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:24 AM
Creation date
10/5/2006 11:53:33 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153304
Contractor Name
Beaver Park Water, Inc.
Water District
0
County
Fremont
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <' <br />,,~ <br /> <br />.. <br />HYDRO <br /> <br />BOX 11223 <br /> <br />.. '}""-, <br />II>' -"'i-.' <br /> <br />ENGINEERI . > . //1/ <br /> <br />CONSULTING WATER ENGINEERS Co ---' -. )/1)) <br />PUEBLO,COLORADO 81001 303-S46-010{)NSERto. WAr '" . <br />ArlO,; <br />uVI'1JtD <br /> <br />APPENDIX B <br /> <br />, <br /> <br /> <br /> <br />Mr. Nick Ioannides <br />Colorado Water Conservation <br />1313 Sherman Street <br />Denver, Colorado 80203 ' <br /> <br />, March 2, 1979 <br /> <br />Board <br /> <br />Dear Nick: <br /> <br />ADDENDUM TO FEASIBILITY STUDY PROPOSAL <br />BEAVER PARK IRRIGATION SYSTEM <br /> <br />The following additional details are added to the proposed <br />work on the major rehabilitation tasks of the previous proposal. <br /> <br />1. Mapping of amount of sediment storage at the diversion dam, <br />Estimate yardage to be removed and cost. Inspection of diversion <br />gate and sluice gate, estimate replacement cost. Estimate cost of <br />concrete repairs, Evaluate the addition of a sand trap in the <br />diversion pipeline. Evaluate ~ir release valves on the pipeline, <br /> <br />2. Survey profile and cross-sections of the Upper Canal. <br />Calculate hydraulic profile at various flows. Calculate flows in <br />each canal segment to size pipe,line or ditch lining and estimate <br />construction costs. Locate all lateral gates and estimate the <br />replacement needs and costs, Make ditch loss measurements to <br />determine segment losses. <br /> <br />3. Survey Brush Hollow spillway cross-section, Calculate the <br />hydraulic capacity, Determine the watershed area and peak inflow. <br />Determine the design of an inlet structure from the upper ditch. <br />Estimate construction costs. Inspect outlet tube and gates. <br />Evaluate seepage control around embankments. <br /> <br />4, Survey profile and cross-sections of Lower Canal from Brush <br />Hollow Dam to Third Street. Make ditch loss measurements to <br />determine segment losses, Determine sizing of ditch lining or <br />pipeline and estimate construction costs, Calculate hydraulic <br />profile. <br /> <br />JlVID /mmd <br /> <br />Very truly yours, <br /> <br />9i. M])M-.u-~ <br /> <br />ohn MDumeyeiJ, PE <br /> <br />cc. Beaver Park Water, Inc, <br /> <br />APPENDIX B <br /> <br />GROUND WATER. HYDROLOGY. WATER RIGHTS. WATER QUALITY. WATER SUPPLY. SEWER STUDIES <br />
The URL can be used to link to this page
Your browser does not support the video tag.