Laserfiche WebLink
<br />I / <br />'., .. <br /> <br />.. <br /> <br />.. <br /> <br />The evaluation of each of these major repair tasks will include available <br />alternatives to solve the problems, along with cost estimates of each <br />alternative solution. The various tasks will be prioritized to develop a <br />phased plan to undertake the system rehabilitation. The phases will be based <br />upon the greatest savings of water per repair dollar expended. Alternative <br />means of finano1ns the rD~air york will aio~ be @VAluated. <br /> <br />The estimated cost of the feasibility study is $6,500. The study should <br />take 3 to 4 months to complete and the required number of copies of the <br />report would be delivered to both the Colorado Wa~er Conservation Board and <br />Beaver Park Water, Inc. John M Dumeyer would be the principal engineer for <br />the study and he has been the consulting engineer for Beaver Park Water since <br />June, 1976. <br /> <br />I will be happy to discuss the details of this proposal with either of <br />you. If you have any questions, please call me. <br /> <br />., <br /> <br />Very truly yours, <br /> <br />q!:.~::;r <br />