My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00402
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:22:24 AM
Creation date
10/5/2006 11:53:24 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153517
Contractor Name
Lone Cabin Ditch and Reservoir Company
Contract Type
Loan
Water District
40
County
Delta
Bill Number
SB 87-15
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />.'J <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />. <br /> <br />inch diameter perforated pipe surrounded by an ap)ropriate <br /> <br />graded filter aggregate such as ASTM C33 concrete sand. <br /> <br />The <br /> <br />toe drain should be sloped to drain outside of and well down- <br /> <br />hill from the downstream slope. <br /> <br />The toe key and bench and toe <br /> <br />drain concept is shown on Figure 1. <br /> <br />LHIITATIONS <br /> <br />It is the owner's and the owner's representatives <br /> <br />responsibility to read this report and become familiar with the <br /> <br />recommendations and suggestions presented. <br /> <br />We should be con- <br /> <br />tacted if any questions arise concerning the geotechnical aspects <br /> <br />of this project as a result of the illformation presented in <br /> <br />this report. <br /> <br />This report presents both suggestions and recommendations. <br /> <br />The suggestions are ideal construction conditions and are <br /> <br />presented so that the owner and the owner's representatives <br /> <br />may weigh the cost to risk or benefit for the suggested pro- <br /> <br />cedures. <br /> <br />This geotechnical engineering report is based on the proposed <br /> <br />site development and the proposed fill material as provided to <br /> <br />us by Mr. Leroy Black, Ute Engineering and Surveying, Inc. <br /> <br />Our <br /> <br />scope of services did not include a site visit to observe the <br /> <br />site conditions or a field investigation to obtain subsurface <br /> <br />information. <br /> <br />Lambert and Associates does not intend that the <br /> <br />owner or the owner's representatives should interpret that a <br /> <br />field study of the existing dam embankment was conducted by us. <br /> <br />-5- <br />M8513lGE <br /> <br />1Lambrrt anb g.6.6'ociatf.6' <br /> <br />CONSULTING GEOTECHNICAL ENGINEERS AND <br />MA TERIAl TESTING <br />
The URL can be used to link to this page
Your browser does not support the video tag.