My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00402
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:22:24 AM
Creation date
10/5/2006 11:53:24 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153517
Contractor Name
Lone Cabin Ditch and Reservoir Company
Contract Type
Loan
Water District
40
County
Delta
Bill Number
SB 87-15
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I'J <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />We do not address any deficiencies that may exist in the <br /> <br />existing embankment. <br /> <br />This report and analysis assumes that the <br /> <br />existing dam embankment has no existing deficiencies other than <br /> <br />a .need for a flatter downstrea~ slope. <br /> <br />The reason for tlle <br /> <br />flatter downstream slope is not known to us. <br /> <br />If the downstream <br /> <br />slope exhibits stability problems, the stability problems may <br /> <br />be deep seated and would reduce the stability of the ~roposed <br /> <br />fill. <br /> <br />We represent that our services were performed within the <br /> <br />limits prescribed by you and with the usual thoroughness and <br /> <br />competence of the current accepted practice of the geotechnical <br /> <br />engineering profession in the area. <br /> <br />No warranty or <br /> <br />re~resentation either expressed or implied is included or <br /> <br />intended in this report or our contract. <br /> <br />We are available to <br /> <br />discuss our findings with you. <br /> <br />If you have any questions please <br /> <br />contact us. <br /> <br />The supporting data for this report is included in <br /> <br />the accompanying figures and appendix. <br /> <br />Please call when further consultation or observations and <br /> <br />tests are required. <br /> <br />CREDITS <br /> <br />The proposed construction information and proposed fill <br /> <br />soils used in our analysis and preparation of this re~ort were <br /> <br />provided by Mr. Leroy Black, Ute Engineering and Surveying, Inc. <br /> <br />The analysis and report preparation were performed by Mr. ~orman <br /> <br />-6- <br />M85l31GE <br /> <br />1Lambert anti g.6'.6'Oclate.6' <br /> <br />CONSULTING GEOTECHNICAL ENGINEERS AND <br />MATERIAL tESTING <br />
The URL can be used to link to this page
Your browser does not support the video tag.