My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00402
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:22:24 AM
Creation date
10/5/2006 11:53:24 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153517
Contractor Name
Lone Cabin Ditch and Reservoir Company
Contract Type
Loan
Water District
40
County
Delta
Bill Number
SB 87-15
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br /> <br />I <br /> <br />SECTION 013~) <br /> <br />DIVISION 1 <br /> <br />SECTION 01500 <br /> <br />CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS <br /> <br />1.01 REQUIREMENTS INCLUDED <br /> <br />A. Sanitary Facilities <br /> <br />B. Construction Aids <br /> <br />C. Barriers <br /> <br />D. Cleaning During Construction <br /> <br />E. Project Identification <br /> <br />F. Field Offices And Sheds <br /> <br />1~02 RELATED REQUIREMENTS <br /> <br />A. Section 01010 - Summary of Work <br /> <br />B. <br /> <br />Section 01700 <br /> <br />Contract Closeout <br /> <br />1.03 SANITARY FACILITIES <br /> <br />A. Provide and maintain required facilities and enclosures. <br /> <br />1.04 CONSTRUCTION AIDS <br /> <br />A. Provide and operate drainage and pumping equipment; <br />maintain excavations and site free of standing water. <br /> <br />1.05 BARRIERS <br /> <br />A. Provide as required to prevent public entry to constuction <br />areas and to protect existing facilities and adjacent <br />properties from damage from construction operations. <br /> <br />1.06 CLEANING DURING CONSTRUCTION <br /> <br />A. Control accumulation of waste materials and rubbish; <br />periodically dispose of off-site. <br /> <br />END OF SECTION <br /> <br />27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.