Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br /> <br />I <br /> <br />SECTION 013~) <br /> <br />DIVISION 1 <br /> <br />SECTION 01500 <br /> <br />CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS <br /> <br />1.01 REQUIREMENTS INCLUDED <br /> <br />A. Sanitary Facilities <br /> <br />B. Construction Aids <br /> <br />C. Barriers <br /> <br />D. Cleaning During Construction <br /> <br />E. Project Identification <br /> <br />F. Field Offices And Sheds <br /> <br />1~02 RELATED REQUIREMENTS <br /> <br />A. Section 01010 - Summary of Work <br /> <br />B. <br /> <br />Section 01700 <br /> <br />Contract Closeout <br /> <br />1.03 SANITARY FACILITIES <br /> <br />A. Provide and maintain required facilities and enclosures. <br /> <br />1.04 CONSTRUCTION AIDS <br /> <br />A. Provide and operate drainage and pumping equipment; <br />maintain excavations and site free of standing water. <br /> <br />1.05 BARRIERS <br /> <br />A. Provide as required to prevent public entry to constuction <br />areas and to protect existing facilities and adjacent <br />properties from damage from construction operations. <br /> <br />1.06 CLEANING DURING CONSTRUCTION <br /> <br />A. Control accumulation of waste materials and rubbish; <br />periodically dispose of off-site. <br /> <br />END OF SECTION <br /> <br />27 <br />