<br />I <br /> <br />I <br /> <br />Section 01200 <br /> <br />I <br /> <br />DIVISION 1 <br /> <br />SECTION 01300 <br /> <br />I <br /> <br />SUBMIT,ALS <br /> <br />I <br /> <br />1.01 CONSTRUCTION SCHEDULE <br /> <br />I <br /> <br />A. The Contractor shall prepare a construction schedule <br />beginning with the date of beginning construction as <br />stated in the Notice to Proceed, and continuing through <br />completion of construction of work. <br /> <br />I <br /> <br />I <br /> <br />B. The construction schedule shall be presented to the <br />Engineer within 10 days of receipt of the Notice to <br />Proceed. Refer to the General Conditions, paragraph 03, <br />Section 00700. <br /> <br />I <br /> <br />1.03 CONSTRUCTION PHOTOGRAPHS <br /> <br />I <br /> <br />A. Photographs are not required for this work. However, the <br />Contractor will have a 1 year quaranty period so <br />photographs of particular portions of the project such as <br />ditch or canal interference may be beneficial at some date <br />after project completion. <br /> <br />I <br /> <br />B. One copy of any photographs taken shall be given to the <br />Engineer. <br /> <br />I <br /> <br />END OF SECTION <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />26 <br />